What's your project topic?

| Back |

Electrical Engineering Project Topics & Research Materials | Final Year Research Project Topics With Free Chapter One

  • 1. RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA

    » ABSTRACT     A power system is set up basically to meet the demands of the customers. However, interruptions which are largely unavoidable contribute to the unavailability of power and thus prevent power system from achieving this. In most cases, it is the sustained interruptions that greatly affect both the utility company and its customers. Hence, it is necessary to find means of determining w...Continue Reading »

    Item Type: Project Material |  65 pages |  5,145 engagements | 

  • 2. DESIGN AND FABRICATION OF MINI COPULA FURNACE AND AN ATOMIZER FOR THE PRODUCTION...

    » ABSTRACT This research is centered on the design and fabrication of copula furnace and atomizer for the production aluminium powder metal with the available material.0.4kg of refined coke was chosen as the basis for material and energy balance calculations and the design calculations performed from whose values are used to produce the design drawings. Mild steel was used for the internal linings o...Continue Reading »

    Item Type: Project Material |  65 pages |  3,895 engagements | 

  • 3. MICROCONTROLLER BASE DOT MATRIX ADVERT DISPLAY

    » CHAPTER ONE  INTRODUCTION    The purpose of this project is to produce a narrative description of the design and construction of a microcontroller based dot matrix advert display. Firstly computer aided design is the modeling of physical system on Computers allowing both interactive and automatic analysis of design variant and the expression of design in a form suitable for manufacturing. This ...Continue Reading »

    Item Type: Project Material |  65 pages |  5,338 engagements | 

  • 4. CONSTRUCTION OF UNINTERRUPTIBLE POWER SUPPLY

    » ABSTRACT   Uninterruptible power supplies (UPS) are used to provide power when regular utility power is unavailable.  Although they are commonly used for providing power in remote locations or emergencies, this is not because they are the same as auxiliary power units, emergency power units or standby generators.Unlike the aforementioned power sources, UPS provides an immediate and continuous s...Continue Reading »

    Item Type: Project Material |  65 pages |  0 engagements | 

  • 5. CONSTRUCTION OF 1KVA INVERTER USING SOLAR PANEL

    » Abstract The project is a construction of inverter using solar panel and its operation. The problems of power lead to the aims and construction of the inverter. This project comprises of four chapters, chapter one deal with the introduction and background of the project. Chapter review of related literature of the project, chapter three construction testing and observation and finally chapter four...Continue Reading »

    Item Type: Project Material |  65 pages |  10,370 engagements | 

  • 6. POWER SUPPLY AND USE IN GYEL DISTRICT JOS

    »   ABSTRACT  The importance of power supply to any economy cannot be overemphasized. It the pivot on which the economic, industrial and technological development of any nation is hinged upon. This study was carried out to assess the state of power supply and use in Gyel District of Jos South Local Government Area of Plateau State. Four communities were selected to constitute the sample population...Continue Reading »

    Item Type: Project Material |  65 pages |  4,475 engagements | 

  • 7. LINE LOSSES MINIMIZATION IN ELECTRICAL POWER NETWORK USING PARTICLE SWARM OPTIMI...

    » ABSTRACT Energy is a basic necessity for the economic development of a nation. There are different forms of energy, but the most important form is the electrical energy. A modern and civilized society is so much dependent on the use of electrical energy. Activities relating to the generation, transmission and distribution of electrical energy have to be given the highest priority in the national p...Continue Reading »

    Item Type: Project Material |  60 pages |  5,667 engagements | 

  • 8. IMPLEMENTATION OF UNIFIED POWER FLOW CONTROLLER (UPFC) FOR IMPROVEMENT OF VOLTAG...

    » ABSTRACT As the demand of electricity from an already congested network increases, ensuring voltage stability across the network becomes challenging. One approach in ensuring system stability is to attain system redundancy but their economic and ecological limitations to this. A more cost effective means would involve the use of existing network component and incorporate less expensive scheme and ...Continue Reading »

    Item Type: Project Material |  65 pages |  4,830 engagements | 

  • 9. IMPLEMENTATION OF AN AUTOMATIC FIRE DETECTION AND ALARM SYSTEM

    » INTRODUCTION The Voice prompt fire detector and extinguisher are considered better alternatives to traditional audible alarms because a voice is typically less likely to instill panic, and the voice feature can be used to give specific instructions, for specific situations. They not only let everyone when an emergency arises but they also inform the people of certain measures to take to avoid conf...Continue Reading »

    Item Type: Project Material |  65 pages |  5,724 engagements | 

  • 10. DEVELOPMENT OF A NOVEL ALGORITHM FOR VOLTAGE STABILITY ASSESSMENT USING SYNCHROP...

    » ABSTRACT As a result of recent increases in demand for electric power, utility transmission systems have been forced to operate under stressful conditions, often close to instability limits. Efforts to construct new transmission lines or enlarge networks are limited due to economic and environmental constraints. According to U.S. Department of Energy, since 1982, the growth in peak demand for elec...Continue Reading »

    Item Type: Project Material |  65 pages |  3,983 engagements | 

  • 11. DESIGN AND FABRICATION OF FREEZE DRYER

    » ABSTRACT Water is responsible for changes in the physical, chemical and/or biological characteristics of foods. It is an important component of all biological or living systems. In fresh foods, the percentage of water varies from 60% to more than 90% (Davide and Salvatore, 2012). Water content in foodstuffs during processing, storage and distribution may lead to deterioration of aroma and degradat...Continue Reading »

    Item Type: Project Material |  65 pages |  4,896 engagements | 

  • 12. DESIGN AND CONSTRUCTION OF AN AUTOMATIC VOLTAGE REGULATOR

    » ABSTRACT This project proposes a new type of voltage regulator based on single phase converter otherwise known as transformerless AVR that compensates wide range voltage variations. This is not only capable of compensating variations at a much higher bandwidth but also does not experience mechanical wear down and is cost effective. The proposed device employs a pulse width modulation (PWM) z sourc...Continue Reading »

    Item Type: Project Material |  65 pages |  9,560 engagements | 

  • 13. A TECHNICAL REPORT ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME AT THE TRANSMISS...

    » ABSTRACT SIWES (Student Industrial Work Experience Scheme) was established by the Federal Republic of Nigeria in the year 1973 to cater for the problem of underdevelopment and skill acquisition and also to impact practical knowledge and skills to students, thus bridging the gap between theoretical knowledge and practical. The Scheme exposes students to industry based skills necessary for a smooth ...Continue Reading »

    Item Type: Project Material |  65 pages |  7,810 engagements | 

  • 14. A SEMINAR REPORT ON STREET LIGHT INSTALLATION

    » ABSTRACT This seminar report is based on the reality of street lighting, kiosk, street light continuity, types of connections in street lighting and its major advantages and disadvantages. Street light installation system is not only easiest but also the powerful technique. The main consideration is the present field technologies which are automation, power consumption and cost effectiveness power...Continue Reading »

    Item Type: Project Material |  65 pages |  5,853 engagements | 

  • 15. A SEMINAR REPORT ON CIRCUIT BREAKERS

    » ABSTRACT This contribution provides an overview on the common on site test methods to ensure the safe and reliable operation of circuit breakers used in high and medium voltage power systems. Failures on circuit breakers can generally be ascribed to defects in one or more of the three main components: The operating mechanism incl. mechanical linkage, the electrical control circuits and the compone...Continue Reading »

    Item Type: Project Material |  65 pages |  6,251 engagements | 

  • 16. A SEMINAR ON THE POTENTIALS OF THE MINI-GRID AS A DRIVER OF THE NIGERIAN ECONOMY

    » ABSTRACT Nigeria is a country with a population of over 170 million; it is rightly the most populous country in Africa and the eighth most populous country in the world. According to the United Nations, one in six Africans is Nigerian. It is a regional power, listed among the “Next Eleven” economies, and a member of the Commonwealth of Nations. Nigeria’s Gross Domestic Product (GDP) was rev...Continue Reading »

    Item Type: Project Material |  65 pages |  4,266 engagements | 

  • 17. DESIGN AND CONSTRUCTION OF A 2KVA POWER INVERTER

    » CHAPTER ONE INTRODUCTION BACKGROUND OF THE PROJECT Electrical/Electronic Engineering is a very important element that cannot be neglected in the society as it is deeply sewn into the fabric of the society. It is an important element in homes to power household devices like electric bulbs, electric cooker, refrigerator, television set, etc. It also finds applications in various work places/offices ...Continue Reading »

    Item Type: Project Material |  65 pages |  6,756 engagements | 

  • 18. DESIGN AND CONSTRUCTION OF A 1KVA MOBILE SOLAR GENERATOR

    » CHAPTER ONE INTRODUCTION 1.1 Preamble A power inverter, or inverter, is an electronic device or circuitry that changes direct current (DC) to alternating current (AC). (The Authoritative, 2000). The input voltage, output voltage and frequency, and overall power handling depend on the design of the specific device or circuitry. The inverter does not produce any power; the power is provided by the D...Continue Reading »

    Item Type: Project Material |  65 pages |  7,956 engagements | 

  • 19. DESIGN AND INSTALLATION OF A REMOTE CONTROLLED SYSTEM

    » AHAPTER ONE INTRODUCTION  OBJECTIVE OF PROJECT  The need for a remote control alert system that can control domestic appliances and various lighting points and sockets has often been a concern for users. At times users find it inconvenient and time consuming to go around turning their appliances on or off each time there is power outage or each time they are leaving the house for work. It has al...Continue Reading »

    Item Type: Project Material |  65 pages |  4,768 engagements | 

  • 20. INDUSTRIAL BATCH COUNTER

    » CHAPTER ONE INTRODUCTION  The industrial batch counter is an electronic and electrical device that handles the counting and controls the flow of individuals using an automated slide door that allows access only when the administrator permits. The technique involved in the design is a simple sensor unit that opens and closes the door when someone obstructs the light path. These parameters can be ...Continue Reading »

    Item Type: Project Material |  65 pages |  4,539 engagements | 

  • 21. DESIGN AND CONSTRUCTION OF AN ELETRONIC DIGITAL DISPLAY SYSTEM (MOVING MESSAGE D...

    » Chapter one   INTRODUCTION   1.1     Background of the study   Electronic digital display system as used in this reports refers to a sign that uses electronic hardware and software to display its copy, messages or images. Also, a sign utilizing a fixed light source to provide a message  in text, images pictures, and / or symbols that may appear to move or may appear as on/off messages. Thi...Continue Reading »

    Item Type: Project Material |  65 pages |  7,378 engagements | 

  • 22. DESIGN AND CONSTRUCTION OF A METAL DETECTOR

    » ABSTRACT The project work titled Design and construction of a metal detector. When fully design and implemented would be able to detect any metallic material that is passing or coming close. This function would serve as a security check for dangerous metallic material as an alarm. Going by the sophisticated means of armed rubbers adopt these days in the breaking into bank supermarkets offices and ...Continue Reading »

    Item Type: Project Material |  65 pages |  12,023 engagements | 

  • 23. CONSTRUCTION OF A RADIO FREQUENCY GSM SIGNAL JAMMER

    » CHAPTER ONE INTRODUCTION A wireless signal jammer is a device that blocks the transmission by createing interference. This wireless signal jammer can be classified as Radio Frequency Interference (RF) and GSM jammer. A radio frequency jammer is a device used to disrupt or prevent communication through a broadcast RF signal. It is a GSM RF frequency and disruptive commonly known as broadband radio ...Continue Reading »

    Item Type: Project Material |  65 pages |  5,513 engagements | 

  • 24. CONSTRUCTION OF A MICROCONTROLLER BASED T--JUNCTION TRAFFIC LIGHT CONTROLLER

    » ABSTRACT T junction traffic light controller is such a device that will play a significant role in controlling traffic at junctions, to ease the expected increased rush at such junctions and reduce to minimum disorderliness that may arise, as well as allowing the pedestrians a right of the way at intervals rather than being struck down when in a hurry to cross the roads. Such an electrical system ...Continue Reading »

    Item Type: Project Material |  65 pages |  2 engagements | 

  • 25. DESIGN AND CONSTRUCTION OF 650WTS POWER INVERTER

    » CHAPTER ONE1.0     INTRODUCTIONThe design and construction of a 650VA inverter one of the numerous breakthroughs in modern technology. As a result of the incessant power outage we experience in the nation, it’s is enough to inform us that every office should have a back up power source to prevent loss of data in times of power outage form the national grid.The project design is to ensure that...Continue Reading »

    Item Type: Project Material |  65 pages |  5,001 engagements | 


Searching makes things a lot easier.. Search for what you are looking for

What's your project topic?