What's your project topic?

| Back |

Chemical Engineering Project Topics & Research Materials | Final Year Research Project Topics With Free Chapter One

  • 1. CONSTRUCTION OF MOTORIZED MIXER

    »   ABSTRACT The fabrication of the pilot motorized mixer in volved a preliminary computation of the durunsions of the galvanized steel used, marketing out cutting out to sizes folding, welding, assembling and painting. The dimensions of the motorized mixer are as follows: The vessel is of 300min in diameter and 450mm in height, the conical edge of the cover is of 300mm in diameter which is formed ...Continue Reading »

    Item Type: Project Material |  65 pages |  4,869 engagements | 

  • 2. CONSTRUCTION OF SIMPLE METALLIC MOULD

    »   CHAPTER ONE 1.0         INTRODUCTION The equipment mostly used in the industries and manufacturing establishments requires the production of definite shape, pattern, different design, embossments and others, are usually moulds.  The ability of moulds to withstand pressure, distortion and corrosion determines the application. A mould has been defined as a pattern constructed for the pr...Continue Reading »

    Item Type: Project Material |  65 pages |  5,399 engagements | 

  • 3. CONSTRUCTION OF PROPELLER AGITATOR

    »   ABSTRACT The construction of propeller agitator used for agitating and mixing of low viscous fluid was fabricated in the mechanical workshop of the institute of management and technology Enugu. In the construction, galvanized mild steel was chosen due to its inherent properties.  After procurement, the following constructional operations were carried out; working drawing, marking, center punch...Continue Reading »

    Item Type: Project Material |  65 pages |  4,909 engagements | 

  • 4. CONSTRUCTION OF METAL SHELF

    »   ABSTRACT In this construction of metal shelf, mild steel was chosen due to its inherit duties. The undismountable metal shelf, which has four compartments and four partition was constructed under the following processes. This  includes drawing and dimensioning of the proposal metal. Metal shelf, market surveying and procurement of the needed materials, marketing out and cutting of the material...Continue Reading »

    Item Type: Project Material |  65 pages |  5,961 engagements | 

  • 5. CONSTRUCTION OF SIMPLE DISTILLATION UNIT

    »   ABSTRACT Distillation unit is the judgment used for the separation of liquid mixture depending on the volatility of the component. It has the top section and bottom section. In the top section this is where more volatile component goes and the bottom section is where the divider or less volatile component are continued therefore when feed are introduced into the column the vapour flows up the c...Continue Reading »

    Item Type: Project Material |  65 pages |  5,998 engagements | 

  • 6. CONSTRUCTION OF SOAP CUTTING DEVICE

    »   ABSTRACT The aim of the project is to construct a soap cutting device capable of size remaining the soap produced into regular bars and tablets without error in shapes and sizes.         Soap cutting devices are used to size reduce or cut the bulk of soap produced into bars and tablets.  Soap cutting devices facilitate the process of cutting the produced soap to a required size that can...Continue Reading »

    Item Type: Project Material |  65 pages |  6,349 engagements | 

  • 7. CONSTRUCTION OF STEEL SHELF

    » ABSTRACT The steel shelf was constructed at the mechanical Engineering workshop of the Institute. The first step taken in the fabrication of the shelf was the selection of the material suitable for the construction; mild steel was chosen. The construction has the following steps: drawing and dimensioning of the proposed steel – shelf, market surveying and procurement of the needed materials,...Continue Reading »

    Item Type: Project Material |  50 pages |  0 engagements | 

  • 8. WATER POLLUTION

    »   ABSTRACT This seminar studied and analyzed Water Pollution, the causes, the effects, the sources, types and control of Water Pollution in the societies water pollution occurred when pollutants were discharged directly or indirectly into water bodies without adequate treatment to remove harmful compounds, Water Pollution affected plant, and organisms living in this bodies of water.       �...Continue Reading »

    Item Type: Project Material |  65 pages |  6,369 engagements | 

  • 9. CONSTRUCTION OF TURBINE MIXER

    »   ABSTRACT The Turbine Mixer was Fabricated at the Mechanical Engineering Workshop of Institute of Management and Technology, Enugu. The method of the fabrication of the turbine mixer involved a preliminary computation of the dimensions of the standard turbine in relation to the dimension of the reacting vessel in which they will be used in, making out, cutting out to sizes, rolling folding, weld...Continue Reading »

    Item Type: Project Material |  65 pages |  5,261 engagements | 

  • 10. CONSTRUCTION OF INDUSTRIAL MIXER

    »   ABSTRACT Industrial mixer is equipment designed to carryout operation involved the combination of two or more substance to achieve a uniform product.        The method of fabrication of this mixer involves a preliminary computation of the dimensions of the standard which they will be used in marketing out cutting, out to sizes rolling or folding, welding, body filling and painting to pre...Continue Reading »

    Item Type: Project Material |  65 pages |  7,003 engagements | 

  • 11. CONSTRUCTION OF KEROSINE COOKING STOVE

    »   Abstract The purpose of the construction is aimed at producing heat energy for commercial use by turning liquid fuel(kerosene).the construction was successful by appropriate selection of engineering material favourably mild steel(blacksheet) and steel iron for special p2rts. The technological properties passed by the chosen mild steel are; machinability ,weldability,durability,andformability.me...Continue Reading »

    Item Type: Project Material |  65 pages |  4,635 engagements | 

  • 12. EXTRACTION OF WAX FROM COCOA POD

    »   CHAPTER ONE INTRODUCTION The word wax describes a large variety of substances of plant and animal origin, as well as man made products which are mostly petroleum derivatives. However, natural waxes are not single substances, but a mixture of various of long chain fatty acids and a variety of other constituents, depending on their origin. Each wax therefore has unique physical and chemical chara...Continue Reading »

    Item Type: Project Material |  65 pages |  6,547 engagements | 

  • 13. REPORT ON FABRICATION OF FLOW NOZZLE

    »   ABSTRACT The flow nozzle was constructed based on the dimensions and specifications of the international standard organization (I.S.O) recommendation. Throat diameter 42.5mm Length converging nozzle 68mm Thickness of nozzle 2mm Diameter of major axis of ellipse 85mm Diameter of minor axis of ellipse 56.6mm Diameter of duct pipe 85mm             The absence of this device (Nozzle) has...Continue Reading »

    Item Type: Project Material |  65 pages |  4,877 engagements | 

  • 14. REPORT O FABRICATION OF FLOW NOZZLE

    »   ABSTRACT The flow nozzle was constructed based on the dimensions and specifications of the international standard organization (I.S.O) recommendation. Throat diameter 42.5mm Length converging nozzle 68mm Thickness of nozzle 2mm Diameter of major axis of ellipse 85mm Diameter of minor axis of ellipse 56.6mm Diameter of duct pipe 85mm             The absence of this device (Nozzle) has...Continue Reading »

    Item Type: Project Material |  65 pages |  4,947 engagements | 

  • 15. REPORT ON THE FABRICATION OF SIEVE SYSTEM

    »   ABSTRACT The construction of sieves system was carried out in the Engineering workshop, Institute of management and technology, Enugu. The aim of this project is to fabricate a sieve system, which is capable of separating solid particles of various sizes. The construction was carried out in order to analyze the sizes of particles. The component parts of the sets of sieve and their dimension are...Continue Reading »

    Item Type: Project Material |  65 pages |  5,181 engagements | 

  • 16. PROCESS AND QUALITY FACTORS IN LAUNDARY AND TOILET SOAP PRODUCTION

    »   ABSTRACT This projects is aimed at knowing the process and quality factor in Laundary and Toilet Soap Projection.  Various factors affected the quality of the soap produced.  These include the method used in production, types and nature of oils used, the percentage of the additives in the soap and the ratio at which oils are mixed to react with alkali. The work was carried out using one type ...Continue Reading »

    Item Type: Project Material |  65 pages |  6,941 engagements | 

  • 17. DEHYDRATION OF ETHANOL WATER SOLUTION USING ACTIVATED STARCH

    »   ABSTRACT This project research work was based on dehydration of ethanol water solution using activated starch. The extracted starch obtained was of whistler method. The starch obtained from potato was weighed with the use of a weighing balance, 0.1gram of activated starch weighted for eight times. The 0.1 gram of activated starch was put in a different test tube. About 20mg of ethanol was measu...Continue Reading »

    Item Type: Project Material |  65 pages |  7,224 engagements | 

  • 18. EFFECT OF INTERFACE ON THE QUALITY OF PETROLEUM PRODUCT IN MULTI PURPOSE PIPELIN...

    »   ABSTRACT Interface on petroleum product in multi purpose pipeline system refers to as the zone of demarcation between two products where mixing occurs.  Generally, interface is a boundary layer, so the boundary between two products when they are pumped in succession is known as interface. In Nigeria Petroleum Industries like NNPC (PPMC) make use of multi purpose pipeline system. This is where ...Continue Reading »

    Item Type: Project Material |  65 pages |  5,606 engagements | 

  • 19. B FABRICATION OF BRIQUETTE STOVE

    »   ABSTRACT This project is an equipment which been fabricated for the principle purpose of producing heat energy for commercial use by burning solid fuel like briquette.  The project which is the fabrication of briquette stove was made from preferentially selected engineering materials like mild steels of different gauge member and metallic rod. These metallic materials posses some mechanical pr...Continue Reading »

    Item Type: Project Material |  65 pages |  5,652 engagements | 

  • 20. FORMULATION AND PRODUCTION OF ALCOHOL FROM PALM WINE

    »   ABSTRACT This research work was arrived as the formulation and production of ethanol (ethyl alcohol) from the fermentation of palm wine. A fresh palm wine was ated which was obtained  from Emene in Enugu State.  The characteristics that was tested before and after fermentation were; specific gravity, refractive index and PH value of the fermentated palm wine was first determined, after which ...Continue Reading »

    Item Type: Project Material |  65 pages |  14,778 engagements | 

  • 21. PRESENTATION ON THE CONSTRUCTION OF "S" LITER ELECTRIC KETTLE

    »   ABSTRACT The construction of the five (5) litre Electric Kettle was carried out in mechanical workshop of the Institute of Management and Technology Enugu. (I.M.T). The fabrication process, included measuring and marking out operations of which the following dimensions was taken; the cylindrical body was taken as 170mm by 700mm in height and length respectively, the base diameter was 223mm, the...Continue Reading »

    Item Type: Project Material |  65 pages |  5,442 engagements | 

  • 22. CONSTRUCTION OF CELLOPHANE SEALING MACHINE

    »   ABSTRACT           The construction of the callophane sealing machine was carried out.  The project started with an encompassing review of the various methods of heat sealing film packages.  The machine can be used in sealing both low, medium and high density cellophane.  The product has a heating element, which converts electrical energy to heat energy, which converts electrical e...Continue Reading »

    Item Type: Project Material |  65 pages |  5,357 engagements | 

  • 23. CONSTRUCTION OF A STEEL CUPBOARD

    »   ABSTRACT             The aim of this project was to construct a steel cupboard in order to help us acquire the knowledge of fabrication of a modern cupboard and the essence of it. Also to enable us (the students of chemical Engineering) to know how to construct as future engineers.             The construction of steel cupboard was done using a square pipe of 1.5mm thickne...Continue Reading »

    Item Type: Project Material |  65 pages |  5,331 engagements | 

  • 24. CONSTRUCTION OF VERTICAL FIRE TUBE BOILER

    »   ABSTRACT             The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu.             The boiler contains 2 steam  tubes at triangular pitch which are enclosed in a shell.  Water is introduced through the shell.  When the burner is ...Continue Reading »

    Item Type: Project Material |  65 pages |  5,741 engagements | 

  • 25. CONSTRUCTION OF STEEL CUPBOARD

    »   ABSTRACT             The project topic was constriction of steel cupboard which the primary aim was to enable students know how cupboard can be constructed using steel and the factors to be considered while choosing a particular material for construction.             The construction was carried out by drawing and sketching of the steel cupboard on a drawing paper or traci...Continue Reading »

    Item Type: Project Material |  65 pages |  4,819 engagements | 


Searching makes things a lot easier.. Search for what you are looking for

What's your project topic?