Home » Environmental Science » LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT: ISSUES AND SOLUTIONS CASE STUDY ...
LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT: ISSUES AND SOLUTIONS CASE STUDY OF ABUJA
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 78 pages | 1-5 chapters | Amount: ₦5,000 | 2 orders. | Marked useful: 5,270 times
INSTANT PROJECT MATERIAL DOWNLOADLAND AVAILABILITY CHALLENGES AND MISMANAGEMENT: ISSUES AND SOLUTIONS CASE STUDY OF ABUJA
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND TO THE STUDY
Abuja the Federal Capital Territory of Nigeria has tremendous importance in the country’s life and development. It is a hotbed for political fermentation, such that generates centripetal attraction from all corners of the country, perhaps nowhere has the need for judicious use and preservation of exhaustive land resources become imperative in Nigeria today than the Federal Capital City. From the outcome of the panel set up by the Federal Government led by Justice T.A Aguda to relocate the Federal Capital Territory from Lagos to Abuja, an 8,000km2 land was carved out of the central region of the country to serve as the Federal Capital Territory for the Nation. There was a misconception that the original inhabitants’ population to be resettled was only between 25,000 and 50,000. However, a later survey in 1984 revealed that their actual population was about 150,000. More than 30 years later, this population has multiplied many times as a result of natural increase and migration.
It is pertinent to understand that the 8,000km2 as the size of the FCT, was not recommended by the International Planning Associates (IPA), the planning firm that produced the Abuja Master Plan, but by the FCT Location Committee, and has been defined in the 1976 FCT Decree even before the IPA was commissioned in June 1977 to plan the city, with the size as one of the terms of reference. Thus, the Abuja master plan has originally been designed with the concept that the whole area has already been evacuated. It was later discovered that the number of the original inhabitants was grossly underestimated. The resettlement cost was astronomical, to the extent of being higher than the money needed for the city development (Elleh, 2012). It therefore became necessary to change the resettlement policy from total evacuation to phases, depending on the actual area needed for the city development.
In ideal situation what should precede plot allocation are land availability, layout design and provision of infrastructure. In order to avoid waste, plots sizes are supposed to be determined relative to the needs of the allotees. If ones need could be contained in 500m2, then any excess portion beside that is a colossal waste of the land resources. Many others that need it could not get because somebody already has the title. In April 2012, the FCT Minister made a revelation at a stakeholders forum, that 90% of allocated plots in the FCT are not developed, which he attributed to lack of infrastructure. Because aggregate provision of infrastructure in the FCT since existence is not more than 25%. However, it is interesting to note that, till date there are many plots in Phase I that were provided with the infrastructure for almost 30 years, but without meaningful development or are fenced only. Recently, there is another very disturbing revelation. It is plot no 2 cadastral zone E13 Gude District sized 465Ha. The outrageous allocation was made to an Accenture Associates Ltd, with address as no. 3104 Mpape, Kaduna Abuja Expressway. The allocation was made dated just only 2 months to the end of the administration. It is now in the property market, being speculated for billions of naira. Still there are large hectare allocations of the Ebele and Obasanjo farms (Jerremy, 2014).
Land Use and Allocation Committee (LUAC) is to make recommendation for lands allocations, but allocations are at times made before reverting to the LUAC.
The model is a misnomer of Financing Urban Infrastructure with Land Value, Never feasible for affordable housing, Distortion of the sharing formula, Not only providing the infrastructure but also saddling the responsibility of resettlement on the developer
.
1.2 STATEMENT OF THE PROBLEM
Abuja officially became Nigeria’s capital on 12 December 1991, replacing Lagos, though the latter remains the country’s most populous city. At the 2006 census, the city of Abuja had a population of 776,298, making it one of the ten most populous cities in Nigeria. Abuja has witnessed a huge influx of people into the city; the growth has led to the emergence of satellite towns such as Karu Urban Area, Suleja, Gwagwalada, Lugbe, Kuje and smaller settlements to which the planned city is sprawling. This growth has affected land availability thereby creating a lot of challenges, a situation whereby whoever needs a land cannot get it easily. However, the researcher is examining Abuja land availability, the challenges and mismanagement involved with a view of proffering solution.
1.3 OBJECTIVES OF THE STUDY
The following are the objectives of this study:
1. To examine the challenges of land availability in Abuja.
2. To identify the issues of land mismanagement in Abuja.
3. To determine the solutions to the issues of land availability in Abuja.
1.4 RESEARCH QUESTIONS
1. What are the challenges of land availability in Abuja?
2. What are the issues of land mismanagement in Abuja?
3. What are the solutions to the issues of land availability in Abuja?
1.6 SIGNIFICANCE OF THE STUDY
The following are the significance of this study:
1. The outcome of this study will enlighten the Nigeria public on the land related issues in Abuja. It will educate on the challenges and issues of Abuja land availability with a view of identifying the solutions.
2. This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic
1.7 SCOPE/LIMITATIONS OF THE STUDY
This study on Abuja Land availability, challenges and mismanagement will cover all the issues related to land availability, mismanagement in Abuja
.
LIMITATION OF STUDY
Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).
Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Reference(s):
REFERENCES Elleh, Nnamdi, Abuja, the single most ambitious urban design project of the 20th century Jeremy. “Sunday, August 27, 2006 Abuja bush bars”. Retrieved 22 November 2013 “Resettlement Issues, Squatter Settlements and the Problems of Land Administration in Abuja, Nigeria’s Federal Capital” (PDF). fig.net. 5th FIG Regional Conference Accra, Ghana, 8–11 March 2006. Retrieved 2007-08-10Methodology: get complete material to enable
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
AN EXAMINATION ON THE CAUSES AND MANAGEMENT OF FLOOD IN RESIDENTIAL AREAS IN KENYA
CHAPTER ONE INTRODUCTION 1.1 Background of the Study One type of calamity that occurs globally on a variety of scales and in various locations each ye...More »
Item Type: Project Material | 67 pages | 1,064 engagements |
- 2.
AN INVESTIGATION ON FLOOD OCCURRENCE AND ITS CONSEQUENCES IN NAIROBI, KENYA
CHAPTER ONE INTRODUCTION 1.1 Background of the Study Nairobi, the capital city of Kenya, holds a significant role in the nation's commerce, industry, ...More »
Item Type: Project Material | 55 pages | 876 engagements |
- 3.
AN ASSESSMENT OF PUBLIC PERCEPTION OF FLOOD RISK IN MOMBASA, KENYA
CHAPTER ONE INTRODUCTION 1.1 Background of the Study The increasing frequency of flooding worldwide is attributed to climate change and various human ...More »
Item Type: Project Material | 54 pages | 785 engagements |
- 4.
AN EXAMINATION OF INDIGENOUS METHOD OF CONFLICT MANAGEMENT IN OKABISI, ENUGU STATE
CHAPTER ONE INTRODUCTION Background of Study The destabilising character of community conflict is one of the distinguishing elements of socio...More »
Item Type: Project Material | 57 pages | 1,346 engagements |
- 5.
ANALYSIS OF THE TOILET SYSTEM EFFECT ON THE SANITATION LEVEL IN KPAKUNGU, MINNA NIGER STATE.
CHAPTER ONE INTRODUCTION Background of the Study [Alexandar, 2017] The World Health Organization (WHO) defines sanitation as the provision of facil...More »
Item Type: Project Material | 54 pages | 1,485 engagements |
- 6.
ASSESSMENT ON THE HEALTH IMPLICATION OF FLOOD IN RURAL COMMUNITIES
CHAPTER ONE INTRODUCTION Background of the Study Flood disaster is not a recent phenomenon in Nigeria and its destructive tendencies are some...More »
Item Type: Project Material | 67 pages | 1,516 engagements |