THE EVALUATION OF INTERNAL CONTROL SYSTEM OF NEPA

📄 Item Type: Project Material| 📋 56 pages| 📚 1–5 chapters| Amount: ₦5,000

THE EVALUATION OF INTERNAL CONTROL SYSTEM OF NEPA

📄 Project Material 📋 56 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now

THE EVALUATION OF INTERNAL CONTROL SYSTEM OF NEPA

(A CASE STUDY OF ENUGU DISTRICT)

TABLE OF CONTENTS

Title page

Approved page

Acknowledgement

Proposal

Table of contents

Chapter one

Introduction

1.1            Background of study

1.2            Statement of problem

1.3            Purpose of study

1.4            Significant of study

1.5            Research question/hypothesis

1.6            Scope of study/limitations

Chapter two

Literature review

2.1            Introduction

2.2            Types of internal control

2.3            Internal control in specific areas of a commercial enterprise

2.4            Objective of internal control

2.5            Some important aspect of internal control system

2.6            Segregation of power or duties

2.7            Physical control over asset and records

2.8            Independent checks on performance

2.9            Limitation and assumption on the effectiveness of internal control

1.0            Control environment and control procedure

1.1            Internal control questionnaire

1.2            Functions of internal control questionnaire

1.3            Brief history of electricity industry in Nigeria

1.4            National electric power authority (NEPA)

Chapter three

          Research methodology

3.1            Population of study

3.2            Sample design

3.3            Source of data

3.4            Research instruments

3.5            Method of data analysis

3.6            Problems encountered in data collection process

Chapter four

Data presentation and

4.1            Questionnaire distribution and take of return

4.2            Analysis of data

4.3            Personal (oral) interview

Chapter five

Summary of findings conclusion and recommendations

5.1            Summary of findings

5.2            Conclusion

5.3            Recommendations

Bibliography

Appendixes

CHAPTER ONE

INTRODUCTION

Background of Study

The statement on study auditing standards defined internal control as being not only internal check and internal audit but the whole system of controls, financial or otherwise, establishment by management in order to secure, as far as possible, the accuracy and reliability of the records run the business in an orderly manner and safeguard the company’s assets its objective being the prevention or early detection of fraud and errors.

          One of the major factor believed to restrict efficient performance of most Nigeria public sector enterprise is un-serious approach towards accountability.  There is a great need to establish internal checks and auditing system as well as defining a control of financial  and management procedure so as to carry on the operations of the enterprise in a way as to guard against the possibility of not only fraudulent practices and financial necklessness but also enhance performance and public confidence the enterprises.

National electric power Authority (NEPA) is an important public enterprise in Nigeria established by decree No.24 of 1st April 1972, with the amalgamation of Electricity corporation of Nigeria (ECN) and Nigeria dams Authority (NDA).  NEPA was empowered to maintain an efficient, co-ordinates and economic system of electricity supply to all the nooks and cranny of the nation.

It’s operations especially it’s financial management and control system has been subject  of intense debate.  This is as a result some unsatisfactory performance as evidenced by near darkness all the time.

There is need to look at the internal control system in NEPA and it’s operational performances in the area of efficiency

1.2     Statement of problem

          The national electric power, authority (NEPA) has the statutory function of catering for the electricity needs of the nation Nigeria.  But the power supply  has some factor contributing to power interruption.  This interruption has terminology, which is termed “planned and unplanned outages”.  For the planned outages, the authority takes light off to do repair and maintenance work to avoid a major breakdown.

          Before this job is embarked upon, customers are normally informed through the media, both princ and electronic. Telling them about the interruption, and length of time involved.

This Project is for You If:

  • ✅You are writing your final year project for the first time and don't want to make costly mistakes
  • ✅This is your exact topic, or very close to what your supervisor gave you
  • ✅Your supervisor has rejected one or more chapters and you don't know what to fix
  • ✅You are stuck on Chapter 3 or data analysis and nothing is making sense
  • ✅Your deadline is close and you are still far behind
  • ✅You can't find enough materials anywhere for your topic
  • ✅My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • ✅I saw my school project requirement and I am confused on where or what to do
  • ✅Everyone in my class has submitted their project and I haven't even started yet
  • ✅My supervisor rejected my research methodology and I don't know what to do
  • ✅I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • ✅I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • ✅I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • ✅My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • ✅I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • ✅I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • ✅This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • ✅I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Delivery Within 24 Hours
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project