THE EFFECTIVENES OF STANDARD COSTING AS A CONTROL TOOL FOR PERFORMANCE EVALUATION IN MANUFACTURING INDUSTRIES

📄 Item Type: Project Material| 📋 56 pages| 📚 1–5 chapters| Amount: ₦5,000

THE EFFECTIVENES OF STANDARD COSTING AS A CONTROL TOOL FOR PERFORMANCE EVALUATION IN MANUFACTURING INDUSTRIES

📄 Project Material 📋 56 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now

THE EFFECTIVENES OF STANDARD COSTING AS A CONTROL TOOL FOR PERFORMANCE EVALUATION IN MANUFACTURING INDUSTRIES

(A CASE STUDY OF ANNAMCO EMENE ENUGU)

ABSTRACT

The direction towards on efficient production of good and services curled be as a result of an effective control of cost of production. The study of standard cresting as an aid is production cost control is very imperative especrahy in an economy with  high rate of inflation and where prices of grads and service are constrarthy increase with no hope of reduction with the effect that th real value of mey in the consumer hand is lower than its face value.

This being the case the consumers only have little to spend there fore  what ill be uppermost in their minds  is to buy product: of cheaper rate when compared wish other products of the same quality.

So this research hoke into ho effective standard costing is in the control of production cost and performance appraisal with reference to the Anambra motor manufacturing company (ANAMMCO) Enugu.

It is the believe of the researcher that for the company to meet one of its goals of producing at reduced cost but consistent quality for customers satrafaction. It have to establish measure to effectively monitor and control production cost standard costing is one of the measures of achieving this.

In order to achieve this p upose backround of the stuy statement of peoblem objective  of the study signitance study was shown in chapter one

TABLE OF CONTENDS

Title page

Certification

Dedication

Acknowledgement

Abstract

Table of contents

CHAPTER ONE: INTRODUCTION

1.1            Background of the study

1.2            Statement of problem

1.3            0bjective of the study

1.4            Significance of study n

1.5            Research question

1.6            Formulation of hypotheses

1.7            Research Method

1.8            Scope are and limitation of study

1.9            Definition of terms.

CHAPTER TOW 

LITERATURE REVWIE

2.1            Meaning of standard

2.2            Types of standard

2.3            Scope of standard costing and variance analysis

2.4            Setting of standard

2.5            Cause of variance

2.6            Use of standard costing and variance analysis

2.7            Purpose of standard cost and variance analysis

2.8            Merit and demerit of standard and variance analysis

2.9            Problem of standard cresting and variance analysis

30. Basic variance analysis.

Reference

CHAPTER THREE

RESEARCH DESGIN AND METHODOLOGY

1.1            Introduction

1.2            Sources data

1.3            Population and sampling

1.4            Analytical tools

CHAPTER FOUR 

Data presentation and analysis 

4.1            Introduction

4.2            Presentation and demographic analysis

4.3            Analysis of question

4.4            Test of hypothesis

CHAPTER FIVE

FINDING CONCLUSION AND RECOMMENDATION

5.1            Summary of handing

5.2            Conclusion

5.3            Recommendation

Boliographi Reference

Appendix

THE RESEARCH PROPOSAL

The direction towards an efficient production of goods and services could be as a result of an effective control of cost of production. The study of standard costing as an  in production cost control is very imperative especially in Nigeria an economy with high rate of inflation so this research  will brok into how effective standard costing is in the control of production cost and performance apprcrisal with reference to the Anambra motor manufacturing company (ANAMMCO) Enugu. This research will cover the control of production cost which include chrect material cost, chrect labour cost and fachy overlead cost through the use of standard  costing system and also the analysis of variances which might arise as a result of comparing the actual cost  incurred with the existing  standard cost of the company. Ion order to source out data for this study the researcher intend to use primary and secondary data which is the most common source of data. The primary data will be soured through the use of questionnaires. Face to face interview and close observation as the case may be while the secondary data will be sources through text books journal and lecture note.  The limited time given for the completion of this research will be amplify when considered that the researcher have to attend to other aspect of his study other than the research work alone since both research work and  academic shidres will be run concurrently.

I must also curmment in the content transportation to Emene where the company of my case study is located the inaraidiliyt of the fund required for this  press’s the seand cirstrant. This will be followed by the inability of the management to chrulge certain  information which they   will consider sensitive and the publication of which will be detrimental to their operation. More so, the attention of the member of top management whom may not be chanced will pours the third constant. It is the believer of the notice of the Nigeria would be entrepreneurs and already existing comparing the need to appreciate the use of standard costing in controlling cost and bars for performance evaluation..

CHAPTER ONE

INTRODUCTION

Civilization sincerely is a welcome phenomenon. The business world is not left out in its resultant effect. Thus, the degree of complexity and sophistication of situations obtainable in the present days business has called for not just experience but effective and formidable managers. The practicality commitment and inefficiency of every manager could be measured based on his ability to plan organize, direct, cirutrol, co-ordinate meteorite and evaluate his business activities these function centers on the resultant checksum makings the process of which are route which   have no close substitute as far as the profit making and progress of any business is concerned.

Hence it is early detached that the profit making to cover the cost and the survival o every industry has informatively become an increasingly difficult task therefore  mangers are faced with entire managerial decision making crises. Sequel to that the ability of every  management to have the managerial decision making process .  under control become pertinent as such industry strive to push and present  its product is a position it could be preferred to the products of other firms in the same line of business. This gare rise to management accounting which improved from the old quantitative approach to accounting to encompass the quantitative  approach to accounting practices

This Project is for You If:

  • ✅You are writing your final year project for the first time and don't want to make costly mistakes
  • ✅This is your exact topic, or very close to what your supervisor gave you
  • ✅Your supervisor has rejected one or more chapters and you don't know what to fix
  • ✅You are stuck on Chapter 3 or data analysis and nothing is making sense
  • ✅Your deadline is close and you are still far behind
  • ✅You can't find enough materials anywhere for your topic
  • ✅My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • ✅I saw my school project requirement and I am confused on where or what to do
  • ✅Everyone in my class has submitted their project and I haven't even started yet
  • ✅My supervisor rejected my research methodology and I don't know what to do
  • ✅I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • ✅I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • ✅I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • ✅My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • ✅I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • ✅I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • ✅This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • ✅I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Delivery Within 24 Hours
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project